Work Completed This Week Storm sewer installation continued along the south side of the Hook Drive Extension. The contractor also continued installing water main, with fire hydrants placed along the alignment. Excavation and shaping of slopes progressed throughout the corridor.
Work Anticipated Next Week Storm sewer installation is expected to be completed along the Hook Drive Extension. Hauling of spoils and grading to subgrade is scheduled to continue across the site. Topsoild respreading is anticipated to begin along the corridor.
Neighborhood Impacts Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.