Subgrade Work and Final Grading

Work Completed This Week
The contractor continued earth excavation for the proposed roadway subgrade and final grading throughout the Hook Drive Extension. Excess material was hauled off-site, and placement of topsoil progressed along the slopes on the west half of the corridor.

Work Anticipated Next Week
Earth excavation for the proposed roadway subgrade and final grading are expected to be completed throughout the Hook Drive Extension. Installation of electrical conduit for proposed street lighting is scheduled to begin. Roadway pipe underdrain and 12-inch aggregate subgrade are anticipated to be installed along the corridor. The contractor is expected to complete the hot tap into the existing water main along Orchard Lane.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Subgrade Work Continues

Work Completed This Week
The contractor continued earth excavation for the proposed roadway subgrade throughout the Hook Drive Extension. Work activities were limited due to weather conditions.

Work Anticipated Next Week
Earth excavation for the proposed roadway subgrade is expected to continue. Placement of topsoil on the remaining slopes along the west half of the corridor is scheduled to be completed. Installation of roadway pipe underdrain and aggregate subgrade is anticipated to begin. The contractor is scheduled to complete the hot tap into the existing water main along Orchard Lane.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Subgrade Preparation and Topsoil Placement

Work Completed This Week
The contractor continued earth excavation for the proposed roadway subgrade throughout the Hook Drive Extension. Placement of topsoil was completed on parkway slopes along the east half of the corridor. The remaining topsoil stockpile was also moved outside of the roadway pavement limits.

Work Anticipated Next Week
Earth excavation for the proposed roadway subgrade is expected to continue throughout the Hook Drive Extension. Placement of topsoil is scheduled to be completed on the remaining slopes along the west half of the corridor.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Drainage Features and Utility Testing Completed

Work Completed This Week
The contractor installed temporary perforated risers and manhole restrictor plates at both basin outfalls. Riprap was placed along the Hook Drive Extension, and excess excavation spoils were hauled off-site. Testing of the installed sanitary sewer and water main was also completed.

Work Anticipated Next Week
Hauling of underground excavation spoils and grading of the Hook Drive Extension to subgrade are expected to continue throughout the site. Respreading of topsoil on slopes along Hook Drive is planned to begin.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Storm Sewer and Grading Work

Work Completed This Week
Storm sewer installation continued along the south side of the Hook Drive Extension. The contractor also continued installing water main, with fire hydrants placed along the alignment. Excavation and shaping of slopes progressed throughout the corridor.

Work Anticipated Next Week
Storm sewer installation is expected to be completed along the Hook Drive Extension. Hauling of spoils and grading to subgrade is scheduled to continue across the site. Topsoild respreading is anticipated to begin along the corridor.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Water Main and Hydrant Installation Progressing

Work Completed This Week
Storm sewer installation continued throughout the Hook Drive Extension corridor. The contractor also continued installing water main and began placing fire hydrants along the corridor. Temporary erosion control blanket was installed to stabilize the topsoil stockpile.

Work Anticipated Next Week
Water main installation is expected to continue along the Hook Drive Extension corridor, and installation of the remaining fire hydrants is scheduled to take place. Hauling of spoils and grading of the roadway to subgrade are anticipated to continue throughout the site. Completion of storm sewer installation along the Hook Drive Extension is planned.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Construction Resumes

Work Completed This Week
Construction resumed on the Hook Drive Extension project. The contractor continued storm sewer installation throughout the corridor and began installing water main along the proposed roadway alignment.

Work Anticipated Next Week
Water main installation is expected to continue along the Hook Drive Extension corridor. Installation of fire hydrants is planned to begin. Hauling of spoils and grading of the roadway to subgrade is anticipated to take place throughout the site.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Site Cleanup and Winter Suspension

Work Completed This Week
Storm sewer installation continued throughout the Hook Drive Extension corridor. The contractor also continued hauling unsuitable material off-site. General site cleanup was completed in preparation for suspending work for the winter season.

Work Anticipated Next Week
The project is suspended for the winter due to weather conditions. Work is anticipated to resume in late winter or early spring, as temperatures allow.

Neighborhood Impacts
Project activity will be minimal during the winter suspension. Occasional site access may occur as needed for monitoring or preparation.

Storm Sewer Installation Progress

Work Completed This Week
The contractor continued storm sewer installation throughout the Hook Drive Extension corridor and continued hauling of unsuitable material off-site.

Work Anticipated Next Week
Storm sewer installation is anticipated to continue along the Hook Drive Extension throughout the week. Hauling of unsuitable material off-site is anticipated to be completed.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.

Storm Sewer and Grading Work Continuing

Work Completed This Week
Storm sewer installation continued throughout the Hook Drive Extension corridor. The contractor also continued earth excavation and embankment placement across the site and hauling of unsuitable material off-site.

Work Anticipated Next Week
Storm sewer installation is expected to continue along the Hook Drive Extension throughout the week. Earth excavation and embankment placement are anticipated to progress across the site. Hauling of unsuitable material off-site is planned to be completed. Seeding and blanket placement in both basins are scheduled to begin, along with temporary stabilization of the topsoil stockpiles.

Neighborhood Impacts
Construction traffic may be entering and exiting the Hook Drive Extension site at Nicole Lane. Residents and drivers in the area should use caution when traveling near the project entrance. Please watch for construction signage, follow all posted traffic control measures, and visit this website for weekly updates throughout the duration of the project.